15.06.2011 Wednesday |
Push and Pull Logistics (Kanban
Method) – M02 |
09.00 – 13.00 14.00 – 18.00 |
Description of the module: Flow simulation from using the Kanban
game (8 hours)
Then, with the Toyotism, we used
methods from the client's request, so we had to use tools such as Kanban to
run these methods.
KANBAN is a mechanism to enslave the
production or supply of a component to the consumer that is made. This step aims to: |